introduce

Project Description

_

The Shahid Tondgouyan Petrochemical Complex, established in 1998 on a 34-hectare site within Zone 4 of the Bandar Imam Special Petrochemical Economic Zone, was built for the production of PET and PTA products. Its product portfolio includes bottle-grade PET, textile-grade PET, polyester POY yarn, and polyester staple fiber.

_

Description of Execution Works

Icon8

Contract Period: 2003–2004 / 2008–2009

  • Fabrication and installation of DEG tank at Shahid Tondgouyan Petrochemical Complex
  • Execution of building and civil works, installation, and pre-commissioning of equipment for SSP Poly-D UnitExecution of civil and reinforced concrete works, construction of 3 material storage silos, fabrication and installation of over 3,000 tons of equipment including steel structures, piping, insulation of pipes and equipment, sandwich panels, pre-commissioning, and commissioning support
  • Project for execution of building and civil works, installation, and pre-commissioning of equipment for Unit PExecution of civil works, excavation, reinforced concrete, and piling; fabrication and installation of over 1,200 tons of equipment including steel structures, piping, insulation of pipes and equipment, sandwich panels, pre-commissioning, and commissioning support