introduce
South Pars Gas Field (Phase 22-24)
_
The South Pars Gas Field, with a processing capacity of 2 billion standard cubic feet of gas per day, produces 50 million cubic meters of refined gas, 1.1 million tons of liquefied petroleum gas (LPG), 77,000 barrels of condensates, 1 million tons of ethane, and 400 tons of sulfur per day.
Its offshore facilities consist of 38 wells, 4 offshore platforms each with a capacity of 500 million standard cubic feet per day, and a pipeline network extending over 270 kilometers for gas transportation and MEG injection.
_
Industrial Operations Description
Contract Period: 2014–2021
- Installation, piping, electrical, and instrumentation works for Units 124, 123, and 122Execution of equipment installation, complete piping works, electrical, instrumentation and control systems, and commissioning
- Completion of installation, piping, electrical, and instrumentation works for Unit 160Installation of equipment, piping, electrical, instrumentation and control systems, and pre-commissioning
- Assistance in commissioning and start-up, preparation of ICAPS, ITP, and log sheetsCommissioning and start-up support, maintenance of equipment and facilities
- Installation, piping, electrical, and instrumentation works for Unit 106Execution of remaining works in Area 1
- Installation, piping, electrical, and instrumentation works for the Utility sectionExecution of equipment installation, complete piping works, electrical, instrumentation and control systems, and commissioning
_
Description of Civil Works
Contract Period: 2016–2018
- Execution of general civil works for Phase 22–24 in Unit 106Approximately 4,600 cubic meters of earthworks and 2,000 cubic meters of concreting