Project Description
_
Alay Mahestan Petrochemical Company, located in the South Pars region (20 km from Kangan), is under construction with an annual capacity of 450,000 tons of propylene and PP-propylene. This unit represents the first PDH facility in the country for propane production and will play a key role in supplying feedstock and developing the regional petrochemical value chain.
_
Industrial Operations Description
Contract period: 2023–Present
- Underground piping70,000 inches in diameter (including sandblasting, coating, fit-up, welding, and testing)
- Civil works100,000 cubic meters of earthworks
- EquipmentConstruction and installation of manholes and valve pits
_
Description of Civil Works
Contract period: 2021–present
- Civil worksCivil works: 22,000 m³ concrete, 160,000 m³ excavation, 4,000 tons of reinforcement, 8,000 m² flooring.
- StructuresPiping, equipment/floating tank foundations, bagging structure, powder silo, TEAL building.
- BuildingsFire station, warehouse, central workshop, administrative building, mosque, restaurant (11,000 m² of built-up area)
- installationsArchitecture, mechanical, and electrical works