After the discovery of oil in Masjed Soleyman (1908), Abadan was selected as the site for the construction of Iran’s first refinery due to its strategic location (proximity to the Arvand and Bahmanshir rivers and access to open waters). The refinery commenced operations in 1912 with a capacity of 2,500 barrels per day. Following the nationalization of oil in 1973, a refinery expansion project was implemented, increasing its capacity from 460,000 to 600,000 barrels per day (1977), which made Abadan the largest refinery in the world at that time.

_

Industrial Operations Description 

Icon8

Contract Period: 2019 – Present

  • Construction of Process UnitsHydrogen Production (HPU-57), Amine Treating (ATU-58), Sulfur Recovery (SRU-59), Sour Water Stripping (SWS-78)
  • Turbo Generator InstallationDesign and Installation of Siemens SGT-700 Turbo Generator with all BOP Accessories
  • pipingExecution of 290,000 Inches of Carbon Steel and Stainless Steel Piping
  • Mechanical EquipmentMechanical Equipment: Installation of 7,000 Tons of Equipment
  • Electrical EquipmentInstallation of 4,100 Units
  • InstrumentationInstallation of 6,500 Units
  • CablingExecution of 600 Kilometers
_

Description of Civil Works

Icon8

Contract Period: 2018 – 2023

  • Covered UnitsHydrogen Production (57), Amine Treating (58), Sulfur Recovery (59), Sour Water Stripping (78), and SSU
  • Earthworks100,000 Cubic Meters
  • Concrete Pouring39,000 Cubic Meters
  • Reinforcement (Rebar) Works4,500 Tons
  • Formwork85,000 Square Meters
  • Structure Installation2,100 Tons
  • Underground Piping45,000 Inches in Diameter
  • Road Construction3,600 Meters of Asphalt Road – Phase 2
  • Concrete Supply14,000 Cubic Meters for Phase 2 Contractors