Shadgan Steel Industry Company, one of the eight key steel projects in the country, was inaugurated in 2006 on a 260-hectare site near Bandar Imam Khomeini. This complex, as the first producer of sponge iron using the PERED (Persian Direct Reduction) method with a capacity of 800,000 tons per year, commenced operation in 2017. Currently, the steelmaking section, including electric arc furnaces and continuous casting, is under construction, which upon completion will enable the full production cycle from iron ore to steel products.

_

Description of Civil Works

Icon8

Contract period: 2021–present

  • Concrete placement: 110,000 m³
  • Reinforcement works: 9,800 tons
  • Formwork: 150,000 m²
  • Architectural works: 10,500 m²
  • Concrete paving/landscaping: 40,000 m²
  • Earthworks: 70,000 m³
  • Driven piles: 95 km
  • Cast-in-place piles: 7 km
_

Operational Units

 

  • Smelting HallEAF Furnace, LF Furnace, Continuous Casting (CCM, SCALEPIT)
  • Foundations Tundish & Mould
  • Oxygen Plant (ASP)
  • WTP، FTP، DEDUSTING Systems
  • BuildingsSubstation, Transformer Rooms, Cable Tunnels, SVC Power Station
  • Material HandlingFerroalloy Shed, Dolomite Bin, Conveyor Gallery
  • FacilitiesIndustrial Building Power and Lighting, Underground (UG) Piping