introduce

Project Description

_

South Pars Phase 14 Project aims to produce 50 million cubic meters of sweet gas, 77,000 barrels of condensate, 2,900 tons of LPG, and 2,750 tons of ethane per day. The scope includes engineering, equipment procurement, installation, and commissioning. Once operational, it will increase the country’s annual capacity by 1 million tons of ethane (feedstock for petrochemical plants), 1 million tons of LPG (for export), and 80,000 barrels of light crude oil

_

Industrial Operations Description 

Icon8

Contract period: 2020–present

  • Mechanical worksInstallation and pre-commissioning of 600 tons of static and rotary equipment – Completion of installation of 5,500 tons of equipment – Execution of 140 tons of refractory works
  • Piping worksExecution of 180,000 inches of pipeline welding (carbon steel/stainless steel), installation of 32- and 36-inch sour gas pipelines, fabrication and installation of supports
  • Electrical and instrumentationInstallation and testing of Power Substations 1, 4, and 6, commissioning of HVAC, and Fire Station building.
  • completion worksPainting, insulation, technical testing, and punch list rectification.