introduce

Project Description

_

The West Karun Combined Cycle Power Plant, with a capacity of 492 MW, is located 45 kilometers from Ahvaz and is the first private power plant of the MAPNA Group using E-Type technology (triple-pressure steam cycle). With an efficiency of 53%, this plant supplies electricity to four West Karun oil fields and the shared fields with Iraq. Its 20-year plan is based on a guaranteed power purchase agreement, playing a key role in the stability of oil projects.

_

Description of Civil Works

Icon8

Contract period: 2019–2022

  • Mechanical equipment installation: 2,000 tons
  • PipingCarbon steel and stainless steel piping: 90,000 inches in diameter
  • Electrical and instrumentation equipment: 2,200 units
  • Cable installation220 kilometers
  • Power plant equipment2 main boilers – HRSG (Heat Recovery Steam Generators)